CONTROL SYSTEM RETROFITS

Control System Retrofits

Modernizing legacy and obsolete control systems for industrial equipment in Ontario — obsolete PLC and drive replacement, HMI migration, and network upgrades, sequenced to avoid unplanned downtime.

Obsolete PLC & Drive Replacement
Upgrades Without Unplanned Downtime
Documentation Brought Current
WHAT WE MODERNIZE

Legacy Systems, Modernized Without Starting Over

Obsolete PLC & Drive Replacement

Migrating off discontinued controllers and drives before a failure forces the decision for you.

Legacy HMI Migration

Moving operator screens off unsupported platforms onto current hardware, without losing what operators already know.

Network & Communication Upgrades

Replacing legacy communication links with current, supportable network architecture.

I/O System Replacement

Swapping obsolete I/O hardware while keeping field wiring and device terminations intact wherever possible.

Reverse Engineering Undocumented Systems

No drawings for the existing system? We document what's actually there before changing any of it.

Documentation Update

As-built drawings and program files brought current, so the next person isn't troubleshooting blind.

OUR RETROFIT PROCESS

Modernized on Your Timeline, Not a Forced Shutdown

1

Existing System Review

Drawings reviewed if they exist; logic and wiring reverse-engineered if they don't.

2

Risk & Scope Definition

Obsolete components, spare parts availability, and what can stay versus what has to change.

3

Migration Plan

Work sequenced to minimize disruption, often planned around an existing shutdown window.

4

Programming & Panel Work

New PLC and HMI programs developed and panel work completed, tested off-line wherever possible.

5

Cutover & Commissioning

Swap and validate against the original system, with a fallback plan if something doesn't go as expected.

6

As-Built Documentation

Drawings and program files updated to match exactly what's installed when the work is done.

WHEN TO CALL US
  • OEM support for equipment has ended
  • Spare parts are no longer available for the existing system
  • System is causing unplanned downtime
  • Existing controls have no current drawings or documentation
FAQ

Common Questions

Can you retrofit a system with no existing drawings?

Yes. Reverse engineering undocumented panels and logic is a routine first step before a retrofit — we document what's actually there before changing anything.

How do you minimize downtime during a retrofit?

Work is sequenced around your existing shutdown windows, with programming and panel work completed and tested off-line wherever possible before cutover.

Do you replace just the PLC, or the whole panel?

Depends on scope. Sometimes it's a straight PLC or drive swap; sometimes the panel itself is obsolete and needs a full rebuild. We scope it to what's actually needed.

Can you migrate an old HMI without changing the PLC?

Yes, when the PLC platform still has a path forward. HMI and PLC migrations are scoped together but don't always have to happen at the same time.

What if spare parts for our existing system are no longer available?

That's one of the most common reasons we get called in. We'll help you decide whether to source legacy parts as a stopgap or move forward with a retrofit.

Ready to Discuss Your Project?

We work with plant managers, OEMs, and integrators across Ontario. Let's talk about what you need.

+1 (905) 960-9535company@gohncontrols.comSend Us a Message